• 6~63A

  • C&D Curve

  • Protection

  • WIFI 4G RS485

ADL3000-E 3-Phase Multi-function Energy Meter

ADL3000 is a smart meter designed for power supply system, industrial and mining enterprises and utilities to calculate the electricity consumption and manage the electric demand. It features the high precision, small size and simple installation. DTSD1352 can be used in all kinds of control systems, SCADA systems and energy management systems. All meters meet the related technical requirements of electronic power meter in the IEC62053-21、IEC62053-22 standards.

  • Fast And Safe Logistics
  • Sample Available

ADL3000-E

    • IEC62053-21、IEC62053-22
    • Din rail mounted
    • kWh: Class 0.5S,kVarh:Class 2
    • AC 3×220/380V,3×380V,3×57.7/100V,3×100V
    • 3×1(6)A,3×10(80)A
    • U、I、P、Q、S、PF、kWh、kvarh
    • RS485(MODBUS-RTU)

Functions

Communication

RS485(Modbus-RTU)

Rated U and I

AC 3×100V, 3×380V, 3×57.7/100V, 3×220/380V; 3×1(6)A, 3×10(80)A

Accuracy

kWh: Class 0.5S,kVarh:Class 2

Frequency

50/60HZ(Optional),range: 45~65HZ

Display

8 digits LCD display U, I, P, Q, PF, kWh and other energy consumption, Power measure (999999.99kWh)

Pulse output

Pulse output kWh/kvarh

Consumption

<10VA(Single phase)

Installation

DIN 35mm

Dimension(L*W*H)

126.5*88*69.5mm

Switch relay

Magnetic latching relay(ADL3000-E build-in)

Clock

≤0.5s/d

Starting current

Direct connect: 0.004Ib

Connect via CT: 0.001ln

Technical Parameters

LCD Display

Wiring

① Seal for Anti theft
② Brand
③ Panel
④ Enter-wire
⑤ Auxiliary function
⑥ Pulse output light
⑦ Button
⑧ Outlet wire

Secondary Access

Dimension & Installation

Network

FAQ



QI bought a three-phase four-wire meter, can it be wired as three-phase three-wire?

AYes, press the key to set the meter to three-phase three-wire mode.

 

QWhat is the difference between ordinary secondary access and -CT (model external transformer)?

AOrdinary secondary meter could access the ratio XXX/5(1)A of the CTs which could be actual current on site, the -CT model comes with an external transformer will be convenient for installation(It cannot be disassembled, otherwise it will burn the meter). There are CTs available on site to facilitate with No stitch removal.

 

QWhat are 3*100V3*57.7/100V3*380V3*220/380V?

A3*100V, 3*57.7/100V are used for high voltage, used in conjunction with voltage transformers, where 3*100V represents 3P3W,3*57.7V/100V represents 3P4W; 3*380V, 3*220V/380V are used for low voltage, direct voltage input, among them3*380V represents 3P3W, 3*220V/380V represents 3P4W.

 

QCan this meter communicate with PLC?

AYes, only need PLC to support RS485 interface, Modbus RTU or DL/T645 protocol.

Package